I'm sure it is something simple that I am overlooking. But I have a fnd. wall with a brick ledge and piers at the columns.
Top of Wall=100'-0"
Top of Ledge=99'-4"
Top of Pier=99'-4"
So the ledge and the pier are a continuos pour but the top of wall portion has to stop at the piers. See attached pdf example showing the disired linework on my foundation plan with highlights for clarity.
Thanks,
Thomas