Adding a splice symbol to non-steel columns in graphical column schedule?
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Top/Base connection symbols are only available for steel columns, but I've been asked if I can add splice symbols to the timber columns (see attached image). Is that possible to do in a smart way?
Link copied