Message 1 of 9
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hi, when splitting a grooved pipe to signal where a length ends and another starts, it is adding 2 grooved couplings onto the pipe instead of just splitting the pipe and putting one joint there? It seems to be that it puts one of the extra coupling connectors onto the other coupling and then on either side of each one is the lengths of pipe?
Ive checked routing preferences but can't seem to see anything myself that it may be because of?
For context, I'm trying to show it in terms of fabrication where the length ends and another is connected via a coupling.
Solved! Go to Solution.