Pipe pressure loss report and critical path
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I have such an issue that i´m creating a small piping network and trying to get the total pressure loss of the critical path. But when i create the report it doesn´t seem to find the critical path. If i look the parameter in the model it is not filled up. And when i look into the pressure report it doesn´t seem to be found.