Hello, I am working on a model which has a long list of equipment that speaks to each other. My schedule needs to have a number of things shown similar to the schedule below:
1. equipment start point (duct from/location description)
2. equipment termination point (duct to/location description)
3. conduit size (duct size)
4. content inside each duct (cable type)
The cable types are not only low voltage signal, but there are chemical lines and air lines which will be connected and/or triggered sending this media to other equipment.
Please let me know if you have any ideas or have done this type of schedule and the depth of parameters needed on each family,
K