I am using Revit 2023.1. The panel schedule has more than 300 circuits, which are divided into different groups. Groups are determined by an additional parameter related to Circuit number. When a new group or circuit needs to be injected, a problem arises.

  1. All reserve rows should be deleted because they cannot be moved. It takes about 15 seconds to delete the reserve of one group.
  2. Move all groups that should be below the injected group. It takes about 45s to move the groups.
  3. Place the group in the created place, and add a reserve of about 2 min.

Injecting the new group 4 took about 45 minutes, because it had to move 30 groups below. Is this slightly optimized in newer versions of Revit? Is there any quick or easy way for this process?

Panel Schedule.PNG

0 Likes
Reply
163 Views
2 Replies
Replies (2)

sragan
Collaborator
Collaborator

Might not help, but check the manage, electrical settings, load calculations, and make sure "run calculations for loads in spaces" is turned off.

 

0 Likes

antonije.jovic
Explorer
Explorer
It's already unchecked