change multiple conduit parallel position

change multiple conduit parallel position

Anonymous
Not applicable
1,021 Views
7 Replies
Message 1 of 8

change multiple conduit parallel position

Anonymous
Not applicable

I've been doing a multiple connections in conduit to a face conector, but when I try to move it, it moves all the elements connected to it.

 

Is it possible to change the height of all the conduits at the same time without moving the elelctric equipment? Or will I have to do all the conduits again?

 

move downmove down

0 Likes
1,022 Views
7 Replies
Replies (7)
Message 2 of 8

ToanDN
Consultant
Consultant

Make sure to tick Disjoin box when you move them vertically.  Ignore the "delete" warning.  

 

Capture.PNG

Message 3 of 8

Anonymous
Not applicable

Hi ToanDN

 

Tks for the answer, but ill try to preserve the conections with the system. there is no other way to do this but keeping the relations betwen objects?

0 Likes
Message 4 of 8

NateBrush
Advocate
Advocate

Not sure this will work, but try using the split tool on the conduits about a foot from the box. Delete the one foot sections. Move the conduits down, then drag them back to connection.

Message 5 of 8

Anonymous
Not applicable

Hi Nate tks for answer, yeah it works but still I have to do all the conections again, there is no other solution for this?  

0 Likes
Message 6 of 8

tino.freitas
Alumni
Alumni

Hi @Anonymous,

 

the conduits you show in your example are coming from connections on the electrical equipment family. If those connections have parameters to modify their height all conduits should change elevation as you specify the height of the connector. Does this help?

 



Tino Freitas
Technical Support Specialist
AutodeskBuilding/playlists | Contact Autodesk Support

0 Likes
Message 7 of 8

tino.freitas
Alumni
Alumni

Hi @Anonymous 

 

following up on your question, can you confirm if you have tried changing the position of the connectors in the family?



Tino Freitas
Technical Support Specialist
AutodeskBuilding/playlists | Contact Autodesk Support

0 Likes
Message 8 of 8

Anonymous
Not applicable

Hi Tino tks for your help, but I was trying to change all the conections at the same time, but all the conduits are attached to 2 electrical equipment at the same time, then when i change one all the others lift up. ive already do all again. tks for your answer. 

0 Likes