When creating a Toposolid from import, provide the ability to specify the spacing between points along contour lines. What nobody is talking about is how poorly Revit creates Toposolids. I showed Asha is real time what a Toposolid looks like that Revit creates from scratch, and how utterly terrible it looks. Revit does not create enough points along contour lines, and consequently the Contour lines that Revit generates bleed all over, making the topography look terrible and not an accurate representation of the actual earth surface. On every project, I have to spend hours and hours of adding points along topo lines to get Revit to create its topo lines that are accurate and look good.