After placing Pipes on a Demo Phase the Drop/Rise symbology changes all Pipes to appear as the pipe is rising.

I suspect this is because once you Demo a pipe (or DW for that matter) Revit undefines the System Type and the connection integrity of the Demo'd pipes.

The only solution is to create a Workset for Demo Pipes and bypass Revit Demo Phasing. It is a workaround but once our Models are in BIM 360 or referenced in another the Model the Phasing of the Element is important.

This makes our Piping drawings look awful and I am unable to find any fixes on the forums.