When linking an IFC4 file in Revit, it would be beneficial to have the ability to map the IFC Renovation Status to a Revit Phase, or to have an alternative method to utilize IFC phasing.
Currently, when an IFC file is linked in Revit, all phasing information is disregarded. Correcting this issue requires significant workaround efforts. Additionally, if the IFC file is updated, the phasing corrections need to be reapplied, rendering the 'link' option and IFC4 impractical when phasing is utilized within the file.