Similar to my discussion on "Displaced Pipes should Carry Insulation," pipe insulation should be linked to the host pipe's phasing. There are very annoying issues with demo and existing pipe and its associated phasing.
I see zero value in having pipe or duct insulation be so disassociated with its host.