Many times schedules need the "calculate total" to be turned ON, so that line by line we do not get the <varies> value.
This does not necessarily means that we need the Grand total, at the end of the schedule.
In these cases, we have to mask these unwanted grand totals on a sheet.
See example attached:

And where this new option could be located:
