Hi all..
Why on the schedule appears a column =0.00 m3 but on the model 1.037 m3 ?
Am I doing something wrong?
Thank you a lot
yes.. I thought the same, but on the option window the material has 1,034 m3 and in the same schedule are many comlumns of 0,030 m3 for example. It is not a tollerance problem
1. How did you determine that column in your schedule was the one highlighted in the 3D view? Did you select "Highlight in Project" from within the Schedule?
2. Is that Column being completely cut by another element, thus zeroing out its volume in the Schedule? Try reversing Join Order.