Thanks, I think this is where the solution lies. Just to have more information, I looked in Visibility Graphics<Site and checked IO and PBP and sure enough, the distance between the two appeared to be the amount of the offset from the marble. So 1) the marble seems to use the IO as the placement point, and 2) If I go to a plan view and can see the underlying model with the PBP in blue and the IO in color for the underlying model quite a distance from the PBP and select Manage<Position<Relocate Project and hover over the visible color IO and select that, the entire project will be relocated so the PBP and the IO are at the same point ? When I check the visibility in the VG, I also see the numerous greyed out IO and PBP for the linked models. I assume they do not relocate in some way that changes their relative position in the overall project, just the underlying project PBP for the base model determines the relocation details and the linked models are brought along in their currently relative positions?