As the title says, i have an existing topographical model in Revit. I have a revised site plan with modified topography that wasn't a "Graded Region", but merely a modified "existing" model. So, there is no direct way of quantifying cut and fill out of two separate RVT files. Question: Is there a way I can import the "existing" model into the "revised" model and join them so that the phases are "existing" and "new construction" primarily so a Topo Schedule will read the cut and fill?
Thank you, in advance, for your guidance.