I have a storefront wall and schedules for cd's. The schedule parameter for wall length changes when a wall is placed perpindicular to the storefront, and I can visibly see the little blue dot grip point jumping into the middle of the adjacent wall and changing the schedule parameter for wall length. I have tried join options, and disallow join, but nothing is getting my schedule, plan, and elevation all reading the same. Any help would be appriciated, thnks. See attached