stair rail

stair rail

Anonymous
Not applicable
562 Views
5 Replies
Message 1 of 6

stair rail

Anonymous
Not applicable

Hi community! How can i connect rail like attached image! Thank you!stair.jpgstair1.jpgstair.jpg

Accepted solutions (1)
563 Views
5 Replies
Replies (5)
Message 2 of 6

RDAOU
Mentor
Mentor
Accepted solution

Hello @Anonymous

 

  1. Select the Top Rail (Use the TAB key to pick only top rail)
  2. On the Properties palette click > Edit Type
  3. On the following dialog - Change Transition to Gooseneck

If this helps; kindly mark this reply Accept as Solution

 

 

YOUTUBE | BIM | COMPUTATIONAL DESIGN | PARAMETRIC DESIGN | GENERATIVE DESIGN | VISUAL PROGRAMMING
If you find this reply helpful kindly hit the LIKE BUTTON and if applicable please ACCEPT AS SOLUTION


0 Likes
Message 3 of 6

Anonymous
Not applicable
is this your version Revit architecture 2015?. Because i use 2014 and i can not use Tab key to chose only Top rail, it did not work.
0 Likes
Message 4 of 6

Anonymous
Not applicable
why in Properties , my rail is Rail Structure (Non Continuous) ,not the Continuouse Rail. So i can not find the Transition Gooseneck
0 Likes
Message 5 of 6

RDAOU
Mentor
Mentor
Are you selecting the top rail only? Not the whole handrail.

When you tab over it the top rail should turn light blue without the balusters and intermediate rails

Sent from my iPhone

YOUTUBE | BIM | COMPUTATIONAL DESIGN | PARAMETRIC DESIGN | GENERATIVE DESIGN | VISUAL PROGRAMMING
If you find this reply helpful kindly hit the LIKE BUTTON and if applicable please ACCEPT AS SOLUTION


0 Likes
Message 6 of 6

Anonymous
Not applicable

My proble is 3 rail is 3 separated part because i draw one by one rail then i apply Pick new host to stair so now i can not chose the whole Rail and use  Transition Gooseneck? What can i do?

0 Likes