I really like the Revit Site Designer but I think I encounter some limitations (must admit that I am new at this).
On my terrain I have excavations / fillings in different phases of the project and I must say it works great !
But I am missing the possibility to copy "terrain points" (interior points) from one phase to another (or from one terrain to another terrain).
I am asking this because the existing terrain is changing (due to new or extra surveys or because of new thoughts in phasing the excavations/fillings).
It would be nice if I could copy the extra or new info to the different phases because now I have to do it manually for all phases (not easy to create new points on exactly the same location).
Is there a way or a trick to "synchronize" the new surveys to all the different phases ?
Terrain
Trying to copy internal points from phase 3 to 4
You cannot copy Toposurface points that way. Be nice if you could though. Post a request for it on the Idea forum. I'll vote for it.