Hi all,

I am tring to schedule my pile foundation and i want to schedule single pile volume using the formula : Volume/Count.

Unfortunatelly count is not usable parameter for formula.

 

How can I solve this issue?

0 Likes
Accepted solutions (1)
621 Views
3 Replies
Replies (3)
Message 2 of 4

Ilic.Andrej
Advisor
Advisor

You need to maintain unit consistency.

 

For example:

Volume=...m3, Count=...unitless

Volume/Count=...m3

So, make sure that the type of a calculated parameter is Volume. If it is a number parameter, you need to get rid of all units in the formula:

Volume/(Count*1m3)=...unitless

 

Try that.



Andrej Ilić

phonetical: ændreɪ ilich
MSc Arch

Autodesk Expert Elite Alumni

0 Likes
Message 3 of 4

ToanDN
Consultant
Consultant
Accepted solution

Just add a calculated value parameter, formula = Volume, format tab: Do NOT Calculate Totals.

0 Likes
Message 4 of 4

XXalessio.amodioXX
Collaborator
Collaborator

Perfect thanks