Sheet Schedule with Revisions

Sheet Schedule with Revisions

KevinQ2WH2
Explorer Explorer
1,892 Views
4 Replies
Message 1 of 5

Sheet Schedule with Revisions

KevinQ2WH2
Explorer
Explorer

I am trying to figure out how to make a sheet schedule that shows what drawings were included in the revision sets. I have the schedule made with all of the required drawings.  We have multiple revisions coming and would like to indicate what drawings were included in each separate issue.

 

Please see the attached sample.

Thanks.

image.png

0 Likes
Accepted solutions (1)
1,893 Views
4 Replies
Replies (4)
Message 2 of 5

vitorbortoncello
Advisor
Advisor

Select Current Revision and make sure to check revision on sheet 

vitorbortoncello_1-1713369043520.png

 

vitorbortoncello_0-1713369015365.png

vitorbortoncello_2-1713369141729.png

 

 

A resposta te ajudou? Não esqueça de curtir e aceitar como solução!


Vitor Bortoncello | Arquiteto | BIM Manager


dAutodesk Certified Professional

0 Likes
Message 3 of 5

KevinQ2WH2
Explorer
Explorer
I have done that, but it doesn't populate a list of past revisions, as shown in the screenshot I provided.
0 Likes
Message 4 of 5

ToanDN
Consultant
Consultant

It cannot be done automatically.  You would need to add sheet parameters for each revision and tick Y/N box or enter the Dot character manually (sort sheet list by current revision so you can do it more easily), or semi-manually via Dynamo.

0 Likes
Message 5 of 5

KevinQ2WH2
Explorer
Explorer
Accepted solution
Thanks for your help with this, that is the information I was looking for.
0 Likes