Announcements
Autodesk Community will be read-only between April 26 and April 27 as we complete essential maintenance. We will remove this banner once completed. Thanks for your understanding

Sheet List Page Range

sgccadteam3
Observer Observer
217 Views
3 Replies
Message 1 of 4

Sheet List Page Range

sgccadteam3
Observer
Observer

Hello Revit community!

I'm working with a large sheet list.  There are so many pages in this drawing set that the schedule doesn't fit on the cover page anymore.  We usually "itemize every instance" on the sheet schedule but in this case I think that listing every individual sheet is unnecessary as they are sequential.  My question is this... Is there a way to populate the Sheet Number column with the first and last page in each category?  (example: C101-C103, P101-P112 etc.)  

 

itemized.JPGcondensed.JPG

0 Likes
218 Views
3 Replies
Replies (3)
Message 2 of 4

robert2JCCH
Collaborator
Collaborator

Not without workarounds (the workaround being doing it manually with a different text-based parameter).

 

When grouping, your options are <varies> or custom text:

robert2JCCH_0-1736382115305.png

The custom text applies to every instance of <varies> so it's not particularly useful in this application.

 

 

Schedules can be broken out into columns - is there room for additional columns on the sheet?

0 Likes
Message 3 of 4

RDAOU
Mentor
Mentor

@sgccadteam3 

 

If you are using 2024 or 2025 you can use sheet collections

  • it is a text parameter basically with exentded sorting options (you can susbtitute it with a project parameter if you are using older versions
  • You can fill manually (Can be done collectively. ie: You input once for the whole collection)
  • You can fill using dynmo (fairly simple and tiny graph)

Using Collection - Revit 2024 or 2025

Sheet collections.gif

 

Using Project Parameter - Revit 2023 and earlier

Pre Revit 2024Pre Revit 2024

YOUTUBE | BIM | COMPUTATIONAL DESIGN | PARAMETRIC DESIGN | GENERATIVE DESIGN | VISUAL PROGRAMMING
If you find this reply helpful kindly hit the LIKE BUTTON and if applicable please ACCEPT AS SOLUTION


0 Likes
Message 4 of 4

azad.Nanva
Advisor
Advisor

you can make the extra parameter for sheets and control the schedule with that!

 

 

If it solves your problem, please click Accept to enhance the Forum.
0 Likes