Second Filter Rules dont get transfered with Transfer Project Standards

Second Filter Rules dont get transfered with Transfer Project Standards

indiana_j0nes
Collaborator Collaborator
276 Views
2 Replies
Message 1 of 3

Second Filter Rules dont get transfered with Transfer Project Standards

indiana_j0nes
Collaborator
Collaborator

Hi,

I have some filters which have more than one Rule.

I have observed that the function under Manage 'Transfer Project Standards', wont transfer the second Rule if its based on Level.

Allow me to illustrate the original filter rule:

and the rule when it gets copied to the other file:

Filter_Copy.JPG

Any ideas on this? I know of a workaround for this would be to split the Rules into two separate filters, but is this a limitation of the Transfer Project Standards? Or a known bug perhaps?

Thanking you guys for taking time to read this far..

Cheers, K

Kunal Tuljaram Gaidhankar

EESignature

0 Likes
277 Views
2 Replies
Replies (2)
Message 2 of 3

ToanDN
Consultant
Consultant
What is that second rule exactly?
0 Likes
Message 3 of 3

indiana_j0nes
Collaborator
Collaborator

Oops.. I missed the first image:

Filter_Org.JPG

If you are trying to recreate the issue, try any logic where you can use level as a Rule.

Cheers, and thanks for your efforts..

Kunal Tuljaram Gaidhankar

EESignature

0 Likes