To calculate the exterior materials, I made 3 types of Filled Region, each named with the Type Mark from it's material (ex: R1 for brick, R2 for Wood, etc) and in the Comments section, I put the name of the elevation so I can sort by material in each elevation. How can I schedule the area of each Filled Region type? The information is in the Properties box but is not available in the schedule fields... I don't want to put area manually, it's not the purpose of Revit... We are in conceptual mode so the model is not properly modelised to make a material schedule.
Instead of Fill Regions, what about Mass Surfaces? The you can pull Surface Areas into Schedule.
Hello @sophie_perron Thank you for posting to the forum!
There are manual options as you mentioned to add a new parameter for scheduling the area of the filled region.
A similar question has been discussed here where utilizing a shared parameter or dynamo was used.
https://forums.autodesk.com/t5/revit-architecture-forum/schedule-2d-areas/td-p/5703197
Here is a video using dynamo on this topic as well.
https://www.youtube.com/watch?v=kd53-ofHCgY