Message 1 of 5
Scheduling areas from Filled Region
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
To calculate the exterior materials, I made 3 types of Filled Region, each named with the Type Mark from it's material (ex: R1 for brick, R2 for Wood, etc) and in the Comments section, I put the name of the elevation so I can sort by material in each elevation. How can I schedule the area of each Filled Region type? The information is in the Properties box but is not available in the schedule fields... I don't want to put area manually, it's not the purpose of Revit... We are in conceptual mode so the model is not properly modelised to make a material schedule.
