Scheduling areas from Filled Region

Scheduling areas from Filled Region

sophie_perron
Enthusiast Enthusiast
13,373 Views
4 Replies
Message 1 of 5

Scheduling areas from Filled Region

sophie_perron
Enthusiast
Enthusiast

To calculate the exterior materials, I made 3 types of Filled Region, each named with the Type Mark from it's material (ex: R1 for brick, R2 for Wood, etc) and in the Comments section, I put the name of the elevation so I can sort by material in each elevation. How can I schedule the area of each Filled Region type? The information is in the Properties box but is not available in the schedule fields... I don't want to put area manually, it's not the purpose of Revit... We are in conceptual mode so the model is not properly modelised to make a material schedule.

0 Likes
13,374 Views
4 Replies
Replies (4)
Message 2 of 5

barthbradley
Consultant
Consultant

Instead of Fill Regions, what about Mass Surfaces?  The you can pull Surface Areas into Schedule. 

0 Likes
Message 3 of 5

michael_coviello
Autodesk Support
Autodesk Support

Hello @sophie_perron   Thank you for posting to the forum!

There are manual options as you mentioned to add a new parameter for scheduling the area of the filled region.

A similar question has been discussed here where utilizing a shared parameter or dynamo was used.

https://forums.autodesk.com/t5/revit-architecture-forum/schedule-2d-areas/td-p/5703197

 

Here is a video using dynamo on this topic as well.

https://www.youtube.com/watch?v=kd53-ofHCgY

 

 

 

 


Michael C
Technical Support Specialist
What's New in Revit 2023 | Autodesk University | Revit Blog
Message 4 of 5

Rambazamba73
Contributor
Contributor

You can use area plans instead

0 Likes
Message 5 of 5

baleti3266
Advocate
Advocate

you can't, sorry

 

upvote this idea so autodesk can ignore it: Scheduling Filled Regions - Area and Perimeter Options - Autodesk Community