Hello,
We are scheduling items on two variations of a specific block (Option A [Primary] & Option B). There are some elements that exist in Option A, but not Option B and vice versa, when creating a schedule though all of the elements from Option B [Non-Primary] are being ignored and not reported. When we change the dropdown from Main Option to Option B, elements from Option B report, but elements from Option A are omitted. Is there a setting that allows the reporting of both options?
We would like to filter them into two separate schedules, but need all of the elements reporting at the same time.