So I am trying to create a schedule with all of the boards that I used in my drawing. For some reason, it wants to keep the count for each at one and then list each component as its own row. I have attached a picture to show what I am talking about. How do I combine these to show a count for each board type? Is it the way I modelled or is there something I am missing in the schedule creation? Thanks in advance!
Gelöst! Gehe zur Lösung
Gelöst von mhiserZFHXS. Gehe zur Lösung
Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.