I'm trying to figure out how to manage interference between wall/floor with MEP. Is there any possibility to schedule/select the wall openings?!
Because designer use to insert an opening wall where the MEP plant has to cross a wall and in this way there isn't any interference. I tryed to delete all the opening, because is possible filter them, but is a total mess and i lose the information of the opening.. so I thought to do the opposite and delete the wall.. but it doesn't work too because the opening is hosted in the wall....
My goal is having a schedule with data like dimension,material,ecc.. of the opening with type and dimension of MEP that passes through it...
Does anybody have the same issue?
Any suggestion will be appreciate
Unfortunately they are created by the opening tool.
Are Voids elements parameterizable? With geometrical value and others informations?!