Revit Architecture Forum
Welcome to Autodesk’s Revit Architecture Forums. Share your knowledge, ask questions, and explore popular Revit Architecture topics.
abbrechen
Suchergebnisse werden angezeigt für 
Anzeigen  nur  | Stattdessen suchen nach 
Meintest du: 

Schedule does not calculate total correctly.

6 ANTWORTEN 6
GELÖST
Antworten
Nachricht 1 von 7
JKspace424
384 Aufrufe, 6 Antworten

Schedule does not calculate total correctly.

I created a schedule for room area totals by floor levels.  I see that the 1st level total is correct but not the 2nd level.  The 2nd level seems to be calculated the 1st level instead.  How can I correct this?

 

Room Area Totals.PNG

6 ANTWORTEN 6
Nachricht 2 von 7
ToanDN
als Antwort auf: JKspace424

Is the schedule itemized?  

Nachricht 3 von 7
JKspace424
als Antwort auf: ToanDN

I've checked the "itemized" box and unchecked it as well.  Does not change anything.

Nachricht 4 von 7
ToanDN
als Antwort auf: JKspace424


@JKspace424 wrote:

I've checked the "itemized" box and unchecked it as well.  Does not change anything.


I didn't suggest checking or unchecking the box would fix it.  Is the image you posted from when the box is checked or unchecked? 

Nachricht 5 von 7
JKspace424
als Antwort auf: ToanDN

the image I posted shows the "itemize" box as checked.

Nachricht 6 von 7
ToanDN
als Antwort auf: JKspace424

Wait a minute.  I gave it a calc and the result is 1,640.  So 1,642 should be correct given some rounding happening.  How did you come up with 1,462?

Nachricht 7 von 7
JKspace424
als Antwort auf: ToanDN

oops.  You're correct.  I must have missed a number or two.

Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.

In Foren veröffentlichen  

Autodesk Design & Make Report