Hello, I am attempting to put together a Room Finish Schedule. I have looked on several forums and have found something that I like, but I am having trouble imitating it. What I found was making a Room Finish Schedule Key, so far that has looked the closest to what I need to do. Unfortunately I cannot figure out how to split the headers. I need to organize by the floor finish and then base, then go into the walls and separate them by which direction they are in, north, south, etc. I have been unable to split the headers so far. Any help on this would be greatly appreciated. Attached is the picture of what I am trying to accomplish. Thank You.
Gelöst! Gehe zur Lösung
Gelöst von ToanDN. Gehe zur Lösung
Gelöst von ToanDN. Gehe zur Lösung
When you see multiple columns beneath a header then they are actually separate columns with their headers grouped in the schedule. To do that, select the headers of the adjacent columns (by press left mouse button one the first one and drag it over the others), and use Group tool.
By the way, the Key schedule you show is very strict. If you use that schedule, when a Room is assigned to a Room style, all the criteria (Floor, Base, NSEW Walls, and Ceiling) will have to match exactly the Room style row on that key schedule. You cannot have deviations from it, let use the Corridor for example:
Based on this key schedule, all Corridors must have the same material and finish on walls on all 4 sides. So if a Corridor is open one or two ends, it does not work.
Thank You so much, now another one for you. How do I get rid of the letters in the column headers? It is showing a letter for every column and I cannot figure out how to get rid of those. Thank You.
Thank you very much. I have got it now, yeah that one is a template I was hoping to take some things from. It definitely needs some adjustments. But thank you very much, I have finally got it how I want it.