Hello everyone
Im facing the problem again and again PLEASE ANYONE HELP ME?
I ve got a revit model from Architect, but it is without any coordinate which Project and Survey Points are 0;0;0 and placed in anywhere on the site view. I need to set a certain coordinate Points and placing them in the new positions then Export the file as FBX file then Insert it into Infraworks 360 with given coordinats. I do so but the Revit Model stay its previous Porject Survey and Project Point position with new coordinates though i've changed poin of positions. Can anyone help me with this issue?
do you not have access to this symbol?
it is typically hidden.
on the status bar at the bottom of revit find the light bulb icon and select it.
your drawing area will be framed red to Reveal Hidden Elements
zoom out to find the symbol select it by window and right click to UNHIDE in View.
after it is visible you can select the middle of the symbol to reveal the coordinates.
@Anonymous hello, you can try to check it <<click HERE>. some tutorials. thanks
Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.