i need to do toposurface in revit 2014.
whenever i change level from the autocad drawing, sometimes revit is not able to detect the project base point to my autocad drawing when i link cad using auto shared coordinate.
usually , when i link cad, the control point in autocad drawing will automate find the project base point in revit. sometimes it does not works. please help.