Revit Architecture Forum
Welcome to Autodesk’s Revit Architecture Forums. Share your knowledge, ask questions, and explore popular Revit Architecture topics.
abbrechen
Suchergebnisse werden angezeigt für 
Anzeigen  nur  | Stattdessen suchen nach 
Meintest du: 

Revisions to BS1192

2 ANTWORTEN 2
Antworten
Nachricht 1 von 3
Anonymous
671 Aufrufe, 2 Antworten

Revisions to BS1192

I see you can now add a prefix for revisions which is great. But is there a way to change the prefix halfway through the revisions?. To British standard BS1192 revisions go P1, P2 etc for pre contract, then when the drawing is contract the revision sequence changes to C1, C2 etc.

 

 

2 ANTWORTEN 2
Nachricht 2 von 3
RDAOU
als Antwort auf: Anonymous

Yes Revit 2016 now allows you to include a profix such as P, C or any other prefix you might wish to use. However; the prefix is applied to all sheets in the model; Hence, it  would only really works if you have a clean break between pre-construction, construction and post construction. Otherwise the pre 2016 method of manualy adding a Prefix entery in the sheet numbering that reflect phase is still more convient more convinient

YOUTUBE | BIM | COMPUTATIONAL DESIGN | PARAMETRIC DESIGN | GENERATIVE DESIGN | VISUAL PROGRAMMING
If you find this reply helpful kindly hit the LIKE BUTTON and if applicable please ACCEPT AS SOLUTION


Nachricht 3 von 3
Anonymous
als Antwort auf: RDAOU

I have now found a way to do it properly to BS1192. When the P1, P2 ETC changes to C1, C2 etc I use numeric for the P1 stage then use Alphanumeric for the C1 stage (as the you change what you want to appear in the sequence)

 

 

Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.

In Foren veröffentlichen  

Autodesk Design & Make Report