Replace levels from one project to another

2 ANTWORTEN 2
Antworten
Nachricht 1 von 3
mairh_tsek
459 Aufrufe, 2 Antworten

Replace levels from one project to another

Hello all,

 

I have two Revit files. In the first one I have the main project and in the second one I have a part of the project.

I want to copy the 'part of the project' to the main project.

 

I open the 3D/ Floor plans / Elevations and I do copy/paste to clipboard.

 

My problem is that in the main project after the copy/paste I have double names levels. Is there any posibility to replace the levels from the part project with the levels that I have in the main project?

 

Thank you in advance!

 

 

2 ANTWORTEN 2
Nachricht 2 von 3
Ilic.Andrej
als Antwort auf: mairh_tsek

Do you really have to copy levels? Select all the geometry and copy to clipboard



Andrej Ilić

phonetical: ændreɪ ilich
MSc Arch

Autodesk Expert Elite Alumni

Nachricht 3 von 3
ToanDN
als Antwort auf: mairh_tsek

Link it in and bind.