Hello all,
I have two Revit files. In the first one I have the main project and in the second one I have a part of the project.
I want to copy the 'part of the project' to the main project.
I open the 3D/ Floor plans / Elevations and I do copy/paste to clipboard.
My problem is that in the main project after the copy/paste I have double names levels. Is there any posibility to replace the levels from the part project with the levels that I have in the main project?
Thank you in advance!
Do you really have to copy levels? Select all the geometry and copy to clipboard