Hi,
Can I get a solution for reducing the thickness of toposurface which is built on level2 structure (kindly see attached image )?
Hopefully,
Muhammed K Ali,
Senior BIM technician
In the Site Settings drop-down dialog box there is a place to enter the Elevation of poche base. Is this what you're looking for?
HI barthbradley
Thank you for replay,
Yes, your right but 'Elevation of poche base' value effect to all toposurface that I tried.
my problem is when we using toposurface on the natural ground level then its fine but when we try to create toposurface on the podium level or on the structural slab then in the section earth hatch is going thought out on the structural slab.
I am looking for using multiple types toposurface in one model then can solve the problem. otherwise, we can different value 'Elevation of poche base' each toposurface.
Hopefully,
Muhammed K Ali
The Elevation of the poche base can be a negative or a positive number. You mean setting the poche base to a height above the structural slab doesn't work for you?
@Anonymous wrote:
HI barthbradley
Thank you for replay,
Yes, your right but 'Elevation of poche base' value effect to all toposurface that I tried.
my problem is when we using toposurface on the natural ground level then its fine but when we try to create toposurface on the podium level or on the structural slab then in the section earth hatch is going thought out on the structural slab.
I am looking for using multiple types toposurface in one model then can solve the problem. otherwise, we can different value 'Elevation of poche base' each toposurface.
Hopefully,
Muhammed K Ali
Don't use topo for earth/soil/landscape above a slab. Use a mass or a floor or a roof with modified points.
Yes,
it is working but similarly, that value will affect all toposurfaces (which is used in ground level or another level).
Thanks,
Muhammed K Ali
Yes of course that we know, we usually using floor and massing only on the slab
I am asking any other solution for this.
because we are working in the complete landscape design firm may be it will help our future.
Regards,
Muhammed K Ali
@Anonymous wrote:
Yes of course that we know, we usually using floor and massing only on the slab
I am asking any other solution for this.
because we are working in the complete landscape design firm may be it will help our future.
Regards,
Muhammed K Ali
Oh good, so you already have had all bases covered. Your firm future is bright and guaranteed.