I have a rebar schedule using the default field/parameter "Quantity".
The quantities it is calculated are coming from area reinforcement. I have it sorted by rebar type, then by bar length.
So my schedule looks like:
22 10M xx"
20 10M xx"
4 10M xx"
I wanted to add a calculated parameter that would show the rebar per face of the wall. So I thought I'd make a calculated parameter that just divides the Quantity field by 2, but it doesn't calculate right. It would give me:
blank for the 22 total
5 for the 20 total
and 1 for 4 total
Why might this be happening?