Hello - a question about working with links on a larger project. I am working on an athletic center where I have my gym as a separate file linked into the "master" Revit project. All well and good, and this is the workflow we are planning on for several other areas in the project. I am wondering, though, about the best way to coordinate the walls of other areas in each file. I assume I shouldn't have circular files (with the "master" Revit file also linked into the Gym file in this case). So when I am working in the gym link, how do I see the surrounding walls, doors, etc. from the "master" file that may have changed since the last time I opened the link? Do I need to keep copying in the latest walls from the "master" file? I need to sometimes see these other walls, doors, etc. in my link so I can work out the doors, windows, etc. in the gym link. How does everyone go about this?