Hello,
trying to put structural coloum in a project.
When I put receive message in attachment 1 "None of the created elements are visible in Floor Plan: Level 1 View. You may want to check the active view, its Parameters, and Visibility settings, as well as any Plan Regions and their settings."
After if to 3d view they are in project but with worng constrain "bace and top constrains in level 1 and base offset at -2.5 m.
When I put a wall are base and top constrains are visible to modified, for structural colou not.
After I can mofidied but somone can say me how can I set the contrains before put the coloum in project to have the correct constrain instead of modifyed later?
Thank's
Gelöst! Gehe zur Lösung
Gelöst von Alfredo_Medina. Gehe zur Lösung
Gelöst von ToanDN. Gehe zur Lösung
If change the command on the project is the same
If choose depth colum go from top to base and is contrary fro height is the opposite, right?
Why next to level in the ribon there is the number 2500 (that is the defaut dimension which go, in the begin, down from level 1) if I constrain the column in the levels?
Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.