Message 1 of 1
Problem to see floor schedule in plan view with multiples levels showing
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I have a plan view that I am currently working in +0,00 level. In this same plan view, I have created a floor range in other to see the lower floor, which is -0,75. So far, so good.
But at the time I schedule my floor area on the lower floor, which is lower than my plan view ( floor in -75cm) I cannot see my areas of the lower level (in the same plan view). How can I solve this problem? Many thanks !