Message 1 of 5
Preparing drawings for Submission, Tendering and Construction
Not applicable
08-09-2019
12:05 AM
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hye guys, im having a little bit of confusion on the workflow of preparing drawings, actually do all the drawings will be created under the same revit file? Because for tendering and construction there is quiet a lot of drawings to be prepared and im concerned that it will increase my file size or will crash the file. Or is there any other workaround to prepare the drawings?