Hi. I am working on a project that has A-2 assembly and B and I want them in the same schedule using an area plan. I am using the formula for B group that is also being used for A-2 which is not right. I have attached a screenshot for you to guide me on how to go about it.

FYI: Not all calculations are right. I am trying to figure out how it would work for one first.

 

0 Likes
Reply
Accepted solutions (1)
993 Views
17 Replies
Replies (17)

barthbradley
Consultant
Consultant

Where is "Required Male WC" being used in Schedule?  Which column?  Maybe it would be better to just post the file for us to analyze. 

0 Likes

aishwaryagNEDYQ
Participant
Participant

"Required Male WC"would be used for Water closets "male" - the value that shows 5.50 for Business and 3.58 for A-2

0 Likes

barthbradley
Consultant
Consultant

@aishwaryagNEDYQ wrote:

"Required Male WC"would be used for Water closets "male" - the value that shows 5.50 for Business and 3.58 for A-2


 

Okay, whatever. Just make it easy for us to help you. Post your file.  

0 Likes

aishwaryagNEDYQ
Participant
Participant

Got the solution

0 Likes

aishwaryagNEDYQ
Participant
Participant
Posted a link for you
0 Likes

ToanDN
Consultant
Consultant

You would need to introduce another Integer or Y/N parameter to distinguish A2 and B, and use it as a conditional factor to create a nested formula.

 

If this formula is for B:

if((OCCUPANCY LOAD < 50), ([Occupant Breakdown(Male)] / 75), (2 + ([Occupant Breakdown(Male)] - 50) / 50))

what is the formula for A-2?

0 Likes

aishwaryagNEDYQ
Participant
Participant
Thank you. The formula has to be "Occupant Breakdown(Male)/75". Currently, both the assemblies are taking the same formula.
0 Likes

ToanDN
Consultant
Consultant

@aishwaryagNEDYQ wrote:
Thank you. The formula has to be "Occupant Breakdown(Male)/75". Currently, both the assemblies are taking the same formula.

So for group A-2, is the formula always Occupant Breakdown(Male)/75 regardless of the load, no threshold at 50 like group B?

0 Likes

aishwaryagNEDYQ
Participant
Participant
No threshold for A-2
0 Likes

ToanDN
Consultant
Consultant
Accepted solution

ToanDN_0-1678222399187.png

 

 

 

if(B, (if((OCCUPANCY LOAD < 50), ([Occupant Breakdown(Male)] / 75), (([Occupant Breakdown(Male)] - 50) / 80) + 2)), [Occupant Breakdown(Male)] / 75)

0 Likes

aishwaryagNEDYQ
Participant
Participant
Can you please share the file with me?
0 Likes

ToanDN
Consultant
Consultant

@aishwaryagNEDYQ wrote:
Can you please share the file with me?

Too big to post. 

You can simply add a Y/N parameter, tick teh box for B row, untick for A-2 row.  Then edit the formula, for example for Required male WC:

 

if(B, (if((OCCUPANCY LOAD < 50), ([Occupant Breakdown(Male)] / 75), (([Occupant Breakdown(Male)] - 50) / 80) + 2)), [Occupant Breakdown(Male)] / 75)

 

Do it for all other columns that you need.

 

 

0 Likes

aishwaryagNEDYQ
Participant
Participant
Thank you! Let me check if that works for me.
0 Likes

ToanDN
Consultant
Consultant

For LAV:

 

if(B, (if((OCCUPANCY LOAD < 80), ([Occupant Breakdown(Male)] / 40), (([Occupant Breakdown(Male)] - 80) / 80) + 2)), [Occupant Breakdown(Male)] / 200)

0 Likes

aishwaryagNEDYQ
Participant
Participant
For LAV, the final value per normal calculations must be "3.88" but Revit is calculating as "5.76" which is wrong.
0 Likes

ToanDN
Consultant
Consultant

@aishwaryagNEDYQ wrote:
For LAV, the final value per normal calculations must be "3.88" but Revit is calculating as "5.76" which is wrong.

I can see why.  You have the schedule unitemized so it gives the false reception of one big area for each group but in fact they are many individual rooms.  Your formula wants to work with a lump sump area, not multiple areas.  I don't have a solution at the moment, need to think a bit more.

0 Likes

3rez
Explorer
Explorer

@ToanDN Was there a solution to handle the multiple areas calculating incorrectly instead of the sum of the area type occupants? 