Anyone else wanted to try placing a schedule or note block in a detail view? I'm trying to make a reference similar to what my SE has done, but with Revit.
Seems like I can't do this directly in Revit, so I'm stuck with either drawing a schedule and using text like the above (yuk), or placing my schedule on a sheet on top of an empty detail view (meh).
Any other workarounds I could use that are more Revit-y?