Placing / Referencing a Schedule in a Detail View

Placing / Referencing a Schedule in a Detail View

david.burow
Advocate Advocate
704 Views
3 Replies
Message 1 of 4

Placing / Referencing a Schedule in a Detail View

david.burow
Advocate
Advocate

Anyone else wanted to try placing a schedule or note block in a detail view? I'm trying to make a reference similar to what my SE has done, but with Revit.

 

Clipboard01.jpg

 

 

Seems like I can't do this directly in Revit, so I'm stuck with either drawing a schedule and using text like the above (yuk), or placing my schedule on a sheet on top of an empty detail view (meh).

 

Any other workarounds I could use that are more Revit-y? 


0 Likes
705 Views
3 Replies
Replies (3)
Message 2 of 4

ToanDN
Consultant
Consultant

@david.burow wrote:

placing my schedule on a sheet on top of an empty detail view (meh).

 


Why do you need an empty detail view (meh)?  Is it just so you can have the view title?

0 Likes
Message 3 of 4

david.burow
Advocate
Advocate

I need a detail title so I can reference it with a detail callout. Preferably a "real" one so the references are updated if it gets moved. 

 

 

0 Likes
Message 4 of 4

ToanDN
Consultant
Consultant

@david.burow wrote:

I need a detail title so I can reference it with a detail callout. Preferably a "real" one so the references are updated if it gets moved. 

 

 


Do the 'meh' approach then.

0 Likes