Phasing of Copied Elements

Phasing of Copied Elements

Anonymous
Not applicable
388 Views
1 Reply
Message 1 of 2

Phasing of Copied Elements

Anonymous
Not applicable

Is there a way to copy an element and maintain the "Phase Created"?  For example if I have a wall that is phased existing can I copy that wall and the copied element remain existing.  Seems like copied elements always default to new construction.

0 Likes
Accepted solutions (1)
389 Views
1 Reply
Reply (1)
Message 2 of 2

ryan.duell
Autodesk
Autodesk
Accepted solution

Hello,

 

Copy and pasted elements will always use the phase of the view they are being pasted into (since they are considered new elements).

 

Thanks,



Ryan Duell
0 Likes