Hi all,
I am working on a refurbishment project and I have existing curtain wall facade. Whole facade is existing building so it is modelled in existing phase. The problem is, we want to create a door on this curtain wall but as you know curtain wall is in 'existing' phase and you are not allow to change only door's phase inside the curtain wall.
I found some solutions and if you want to demolish existing door which nested in the curtain wall they are OK but I want to create a new door(proposed phase) into the existing curtain wall.
Thanks in advance.
Ps; I've attached a screenshot which show particular area of the project and color legend is; Grey - Existing phase, Orange - Proposed and Red - Demolished.
Regards
Baris
split the curtain wall on both side and assign the area to be demolished in new construction phase.
then in a new view create the matching curtain wall and door in the area that was split.
- Edit profile the existing curtain wall and make a hole at the door
- Fill the hole with a curtain wall type with just the door under existing phase, then demolish
- Copy paste the door above to new phase and change door type if required
another approach would be to host the "Proposed" door to an embedded wall.