Phasing issue for curtain wall doors.

Phasing issue for curtain wall doors.

barisbagis
Participant Participant
752 Views
3 Replies
Message 1 of 4

Phasing issue for curtain wall doors.

barisbagis
Participant
Participant

Hi all,

 

I am working on a refurbishment project and I have existing curtain wall facade. Whole facade is existing building so it is modelled in existing phase. The problem is, we want to create a door on this curtain wall but as you know curtain wall is in 'existing' phase and you are not allow to change only door's phase inside the curtain wall.

 

I found some solutions and if you want to demolish existing door which nested in the curtain wall they are OK but I want to create a new door(proposed phase) into the existing curtain wall.

 

Thanks in advance.

 

Ps; I've attached a screenshot which show particular area of the project and color legend is; Grey - Existing phase, Orange - Proposed and Red - Demolished.

 

Regards

Capture3.JPG

Baris

0 Likes
753 Views
3 Replies
Replies (3)
Message 2 of 4

kadmonkee
Advisor
Advisor

split the curtain wall on both side and assign the area to be demolished in new construction phase.

then in a new view create the matching curtain wall and door in the area that was split.

 






If there is any information shared that is of value please give Kudos
If a solution is provided by any posters please mark them as Solved to benefit everyone else.
thank you
0 Likes
Message 3 of 4

ToanDN
Consultant
Consultant

- Edit profile the existing curtain wall and make a hole at the door

- Fill the hole with a curtain wall type with just the door under existing phase, then demolish

- Copy paste the door above to new phase and change door type if required

0 Likes
Message 4 of 4

barthbradley
Consultant
Consultant

another approach would be to host the "Proposed" door to an embedded wall.  

0 Likes