Community
What are the differences between the Phasing's "Show All" and "Show Complete?
(Assuming that you are drawing with Revit 2020 the renovation of an existing commercial building where you have to draw it at the beginning to show what is existing, showing some limited demolition, and then superimposing the new work on the same drawing).
Thanks in advance.
Check out the Phase Filters/Phase Overrides dialog boxes under Manage Tab=>Phases. It is customizable.
Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.