I have read all post regarding this issue but there is nothing that help me to complete this task. It a really common practice in site design projects. I need to schedule different area and compare their percentage with the lot area. For instance i need to schedule all green area on a property and determine what is the percentage of the lot area. Same to the building total area etc. So far i am able to list and schedule all areas but i have no way to cross those areas is revit lot area to make the calculations. Does anyone figure it out how to do this?
thanks in advance.
W