Hello,
Does anyone know a formula to make the center column repeat the sequence A B C. I don't want to use text in these areas because of the max pole breaker parameter that is included in the schedule. That parameter will actively change the number of poles in the schedule, so I figure a formula parameter would be ideal to get the A B C sequence to show up correctly no matter the number of poles. Right now I am using a formula to get the "A" to show but need that A B C sequence to populate instead.
Any thoughts or suggestions would be very appreciated.
Thanks!
PS: This is my first time dealing with Panel Schedules in Revit so apologies if there is some very simple solution to this.