I currently have a problem with numbering on the schedule. Because I'm currently making a manual, so when I add a line or delete a line, I have to retype it. Does anyone have the same problem and the solution Thanks.I currently have a problem with numbering on the schedule.
Because I'm currently making a manual, so when I add a line or delete a line, I have to retype it.
Does anyone have the same problem and the solution
Thanks.
Gelöst! Gehe zur Lösung
Gelöst von ennujozlagam. Gehe zur Lösung
you can refer to autodesk apps store .and see if helps
Need some more information to troubleshoot. Like to see the Schedule setup. Can you post it?
I will try with this application, if indeed there is no credit from revitnya,
Thank you for helping
I've actually found a way online, You can check it right here
https://www.youtube.com/watch?v=H1Z3f1pgyPE
i manually number the parts highlighted in red, it takes a lot of time so maybe is there any tool to automatically number this section?
Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.