Hi, I’m fairly new to Revit and currently getting myself up to speed with the package. I was wondering if it’s possible within the software or potentially using an addon, to label or incrementally number the elements within the build, that could be exported as part work schedule.
For example, numbering or labelling out the order to lay tiles onto the floor within a particular area.