Hello, everybody:

I am creating a take-off schedule of concrete elements. The schedule works fine calculating the total cubic meters of every type of concrete. But I want to add a field that use a number parameter to calculate, e.g., the quantity of sand use in all the project.

Let's say, that I have three types of concrete, one has a 40% of sand, another has 50%, and the last one 60%. So, I create this field named "Sand" and beside every type of concrete I put the respective percentage of sand.

(I will later create another field to calculate the cubic meters of sand.)

Here is the problem: Everything goes fine until I assign a type of concrete to the stairs. As soon I do that the Field "Sand" is blocked (only for that type of concrete) and I can not put the percentages.

I tried this in Revit 2020 and worked even including the stairs, but in Revit 2023 is impossible.

I will appreciate your help with this issue.

 

(I am attaching a copy of the revit file and two images. In the revit file the stair has no material assigned.)

 

agorritmia_0-1684863818339.png

agorritmia_1-1684864373010.png

 

 

0 Likes
Accepted solutions (1)
594 Views
4 Replies
Replies (4)
Message 2 of 5

kostask_oionei
Advocate
Advocate

Hola,

As I noticed is a "Structural Foundation" Schedule for Phase "Phase 3".

 

2023-05-25_14-07-44.jpg

 

But the stair is in "Stairs" Category in phase "Escalera"

 

2023-05-25_14-08-31.jpg

 

Maybe here is the problem. As you create the schedule you have to choose the right phase.

 

2023-05-25_14-15-19.jpg


If my post help you, please give a like.
If your question was answered please mark it with ACCEPT SOLUTION. This helps others to find answers...


Kostas Kouris
Architect Engineer, M.Sc., ACI, ACP

0 Likes
Message 3 of 5

agorritmia
Participant
Participant

Thank very much for your answer.

Even if I change the stair to "Phase 3" always happens the same thing: The field do not works.

After changing the Phase of the stair I created a new schedule (like the other one but from scratch) but it did not work neither.

 

UPDATE: (See attached image) I added two fields to the schedules: Comments and Type Comments, in order to identify the components of the stair, and I found that the Landing and the Runs do not allow to fill the field "Sand" but the Stair, as a whole, do allow it.

That would be OK but the quantity of concrete of Landing and Runs are summed up in the totals, e.i., I have the cubic meters of the stair (2.96 m3) *plus* the cubic meters of the landind and the runs (0.70 m3 + 1.11 m3 + 1.15 m3)

 

agorritmia_0-1685036701696.png

 

UPDATE 2: I can deal with the duplication of quantities. But the Slab Edge have the same problem of the Stairs and I can not solve it using the trick of Comments and Type Comments fields.

 

 

0 Likes
Message 4 of 5

kostask_oionei
Advocate
Advocate
Accepted solution

Hola @agorritmia ,

 

You can edit the parameter "Sand(%)" and check the Slab Edges, Landings, Runs, and other subcategories that you like.

 

2023-05-26_16-51-46.jpg


If my post help you, please give a like.
If your question was answered please mark it with ACCEPT SOLUTION. This helps others to find answers...


Kostas Kouris
Architect Engineer, M.Sc., ACI, ACP

Message 5 of 5

agorritmia
Participant
Participant

That was the problem! Thank you so much.