Hello, everybody:
I am creating a take-off schedule of concrete elements. The schedule works fine calculating the total cubic meters of every type of concrete. But I want to add a field that use a number parameter to calculate, e.g., the quantity of sand use in all the project.
Let's say, that I have three types of concrete, one has a 40% of sand, another has 50%, and the last one 60%. So, I create this field named "Sand" and beside every type of concrete I put the respective percentage of sand.
(I will later create another field to calculate the cubic meters of sand.)
Here is the problem: Everything goes fine until I assign a type of concrete to the stairs. As soon I do that the Field "Sand" is blocked (only for that type of concrete) and I can not put the percentages.
I tried this in Revit 2020 and worked even including the stairs, but in Revit 2023 is impossible.
I will appreciate your help with this issue.
(I am attaching a copy of the revit file and two images. In the revit file the stair has no material assigned.)
Solved! Go to Solution.