How do I get the stringer to connect at the landing?
I drew it as a stair up to the mezzanine level, then made it multistory to get to the second level. Then I added a landing on the top of the bottom stair.
Gelöst! Gehe zur Lösung
Gelöst von barthbradley. Gehe zur Lösung
Ok! I have tried this before and it's tough because I have to draw runs directly one above another. Is there a good trick to doing this?
I don't know about any tricks. Just sketch it in Plan View and set the Base and Top Level.
what I end up doing is drawing the 3rd and 4th run outside of the first two. Then I move them directly above the first two. Is there a better method? It feels odd doing this.
I just sketch mine in one fell swoop in Plan View by drawing runs on top of each other. Of course, first I set my top and bottom level . If you added an extra step or two, and ended the same result, then so be it.