Community
Hello,
I created a shared text parameter and assigned specific "item numbers" across multiple categories (furniture, lighting fixtures, wall sweeps, and materials) I can get the numbers I assigned to appear in separate schedules, but the issue is I need all of these "item numbers" i assigned to populate in the same schedule. Furniture and lighting work fine and populate together but materials and wall sweeps need their own schedule.
Is there a way go get them all to appear on the same schedule?
Sounds like you need a Multi-Category Schedule and a multi-category Project Parameter.
Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.